A 140-ft wood retaining wall replacement with individual stair access, gravel backfill and drainage behind the wall. Completed in two weeks, with material transfer and construction coordinated around residents.

Wood retaining wall and five staircases under construction at a Coquitlam strata
ARGYLL DEVCO / COQUITLAM, BC

Wood retaining wall replacement

Built for the site.
Coordinated for residents.

This Coquitlam strata project replaced 140 feet of wood retaining wall and included five separate staircases serving the individual units. The scope brought together removal, excavation, timber wall construction, gravel backfill and drainage work behind the wall.

Over the two-week project, 50 tons of material were transferred. Traffic control and planned construction hours helped accommodate residents while the work progressed.

The photos below follow removal through wall construction, staircase work and grading.

140 ftWood retaining wall
5 staircasesSeparate access for individual units
2 weeksProject completion
50 tonsMaterial transferred
DrainageGravel backfill and work behind the wall
Resident coordinationTraffic control and planned construction hours

02 / Excavation & gravel base

Preparing the wall line.

03 / Wall construction & drainage

Building the wall and its support.

04 / Staircases & grading

Five staircases. Individual unit access.

05 / Material transfer & coordination

Planned around an occupied strata.

Let’s talk about your project

Planning a retaining wall
for your strata?

Send your site address, photos, access details and the retaining wall, drainage and stair access work you have in mind.

Request a quote

Tell us a little about the job. Fields marked * are required.

We use these details to respond to your enquiry. FormSubmit delivers your request to our inbox. Privacy policy. For photos, text us or email us.