CLIFF AVE · WHITE ROCK, BC
Excavation to
framing-ready foundations.
A pool house / laneway foundation and utility package on Cliff Ave: new concrete foundations, protected walls, drainage, radon piping and backfill ready for the framing crew.

Pool house / laneway foundation package
The groundwork
for what comes next.
Argyll Devco completed excavation and new concrete foundations, with new drainage, dampproofing and waterproofing, radon piping installation and a precast concrete sump basin.
Gravel was delivered by slinger, followed by backfill and preparation for the lumber and framing stage. The package also included trenching for water, sanitary and hydro services.
These photos document the foundation and utility work before framing begins.
01 / Excavation & material handling
Opening up the site.
Select any photo to view it at full size.
02 / Foundations & wall protection
New concrete. Protected walls.
Select any photo to view it at full size.







04 / Gravel, backfill & service rough-ins
Ready for the framing crew.
Select any photo to view it at full size.
Let’s talk about your project
Planning a foundation
or laneway project?
Send your site address, project drawings, access details and the foundation and utility scope you need priced.















